BP BALMORAL BP have just advised that this facility at 170 Balmoral Road, Balmoral, Auckland will be closing today (30 September 2014) and will NOT re-open.
Mobil 22 September 2014
MOBIL FAULKNORS : 1 – 3 QUEEN STREET : MASTERTON We wish to advise the temporary site closure on the 22nd September 2014 for the site image and hardware upgrade. As we cannot safely isolate parts of this site to remain open, the entire site will be closed from 7.00am Monday 22nd September, and estimated completion and reopening at 7.00am Saturday 27th September. The alternate sites in the Masterton area are: KURIPUNI MOTORS, 229 Chapel Street, Masterton *** PAK N SAVE MASTERTON, Cnr Chapel & Crayne Streets, Masterton *** WESTERN AUTO MART, Ngamutawa Street, Masterton.
Mobil 22 September 2014
MOBIL CREYKE ROAD : 106-108 CREYKE ROAD : CHRISTCHURCH We wish to advise the temporary site closure on the 29th September 2014 for the upgrade of the forecourt and store, including installing an additional diesel pump. As we cannot safely isolate parts of this site to remain open, the entire site will be closed from Monday the 29th September, and estimated completion and reopening 16th December 2014. The alternate sites in the Christchurch area are: MOBIL HAGLEY SOUTH, 30 Moorehouse Avenue, Addington *** MOBIL WIGRAM, 243 Main South Road, Wigram *** MOBIL PAPANUI, 23 Main North Road, Papanui.
Mobil 22 September 2014
MOBIL MANFIELD The Mobil service station near Manfield in Feilding is ceasing to sell Mobil fuel and will no longer be able to accept Mobilcard as a method of payment from the end of September 2014. For your convenience, the Caltex Feilding station at 114 South Street will accept Mobilcard. Just to remind you that although your discount will not be available at the Feilding site, throughout the Manawatu region we have a strong network of sites where you can still obtain fuel with your Mobilcard and receive your normal Mobilcard discounts . These sites are located at: *** State Highway One at Mobil Levin, Mobil Bulls and Mobil Taihape. *** Palmerston North we have 3 Mobil stations and the Pak n’Save fuel outlet *** On the way over to the Wairarapa, Ashhurst Service Centre is available 24/7 to give you discounted fuel using the outside payment terminal.
Z Energy 14 August 2014
Z MOUNT ALBERT will be upgraded from 25 – 29 August 2014. It will be closed most of the day on 27 August, but fuel will still be available.
Z Energy 14 August 2014
Z HILLSBOROUGH ROAD Will be upgraded during 25 – 29 August 2014. It will be closed for most of the day on 27 August 2014.
Z Energy 14 August 2014
Z TAUMARANUI TRUCKSTOP This facility will be closed for 2 days from 20 August 2014. Alternate sites are: Z Te Kuiti Truckstop, Te Kumi Road, Te Kuiti *** Z Turangi Truck Stop, Atirau Road, Turangi *** Z Waiouru Tuck Stop, State Highway 1, Waiouru. *** Z Waitara Truck Stop, Cnr Raleigh Street and State Highway 3, Waitara.
Z Energy 14 August 2014
Z RANGIORA Z Energy advise that they are are upgrading the switchboard at Rangiora retail site which means we have to cut power to the whole site, including the truckstop, on Mon 11 Aug from 7pm until 7am (could be 8am) the next morning. The following Monday 18 Aug we will cut power to the Retail site for the same time frame and potentially the truckstop.
Z Energy 1 August 2014
Z ORMISTON ROAD This facility will be upgraded during 18 August to 22 August 2014 and will be closed for one day on 20 August 2014.
Z Energy 1 August 2014
Z BROWNS ROAD This facility will be getting an upgrade from 18 August to 22 August 2014 and will be closed on 20 August for one day.